Customization: | Available |
---|---|
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
(mm) The hole diameter |
140-325 | (mm) Drill pipe diameter |
Φ60 Φ76 Φ89 |
(m) Drilling depth |
360 | (m) Drill pipe length |
2.0m |
(kw) Equipped capacitor |
Four-cylinder 85kw diesel engine | (T) Rig lifting force |
16 |
(N.m) Swing torque |
5000-7500 | (mm) Dimension |
2500×1200×1800 |
(rpm) Swing speed |
80-200 | (m) High leg stroke |
2.4 |
Containing BW160 mud pump |
Wanhai Machinery Co., Ltd., proudly located in Linyi, Shandong, stands as a distinguished leader in the design, development, production, and distribution of premier drilling machinery and equipment. Our diverse portfolio includes oil and gas drilling rigs, water well drilling rigs, core drilling rigs, and more, perfectly suited for a wide range of drilling applications. We are dedicated to providing unparalleled products and services, meticulously tailored to fit the unique needs of each client. Our exceptional after-sales team is committed to promptly resolving any issues, ensuring complete customer satisfaction.
We are excited to forge long-lasting, trustworthy, and mutually rewarding partnerships with every client. If you're intrigued by our offerings, we invite you to connect with us. Rest assured, our team is ready to equip you with all the information and support needed for a well-informed choice.
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2.How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
3.How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 25-30 days.
4. What's your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.