Customization: | Available |
---|---|
Material: | PU |
Fire Hose Manifold Type: | 2 Water Segregator |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material
|
PVC
|
Specification
|
1''-8''
|
Length
|
100M or customization
|
Thickness
|
1mm-3mm
|
Processing Service
|
Moulding, Cutting
|
Material
|
plastic
|
Working Temperature
|
-10--+65ºC
|
Usage
|
Delivery Water
|
Length
|
100 m or Customized Length
|
Application
|
Irrigation
|
Packing
|
100m/roll
|
Color
|
Green/Red/Black/White
|
OEM
|
OEM Service Accepted
|
Sample
|
Free-provide
|
Prefered Double | Wide Range Of Uses | Convenient splicing |
layer polyester lineThe use of PVC double-sided plastic coating and polyester line greatly increases the product's pressure resistance. | The products are suitable for agricultural irrigation and forestry irrigation.Water transmission use in buildings, etc. | The length of the water pipe can be spliced arbitrarily, the length is not limited, and it is easy to move and wear-resistant. |
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2.How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
3.How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 25-30 days.
4. What's your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.