Customization: | Available |
---|---|
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
(mm) The hole diameter |
140-325 | (mm) Drill pipe diameter |
Φ60 Φ76 Φ89 |
(m) Drilling depth |
360 | (m) Drill pipe length |
2.0m |
(kw) Equipped capacitor |
Four-cylinder 85kw diesel engine | (T) Rig lifting force |
16 |
(N.m) Swing torque |
5000-7500 | (mm) Dimension |
2500×1200×1800 |
(rpm) Swing speed |
80-200 | (m) High leg stroke |
2.4 |
Containing BW160 mud pump |
Wanhai Machinery Co., Ltd., nestled in Linyi, Shandong, stands as a beacon of excellence in the design, development, production, and distribution of superior drilling machinery and equipment. Our comprehensive product array features various drilling rigs, including oil and gas, water well, and core drilling rigs, designed to excel in diverse drilling environments. Our steadfast dedication is to provide superior products and services crafted to meet the specific needs of our clients. We boast a committed after-sales team that promptly addresses any issues, ensuring unparalleled customer satisfaction.
We eagerly look forward to cultivating lasting, trustworthy, and mutually rewarding relationships with all our clients. If our products pique your interest, please feel free to contact us. We guarantee our team will supply the essential information and support to guide your decision-making process.
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2.How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
3.How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 25-30 days.
4. What's your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.