Customization: | Available |
---|---|
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
(mm) The hole diameter |
140-325 | (mm) Drill pipe diameter |
Φ60 Φ76 Φ89 |
(m) Drilling depth |
360 | (m) Drill pipe length |
2.0m |
(kw) Equipped capacitor |
Four-cylinder 85kw diesel engine | (T) Rig lifting force |
16 |
(N.m) Swing torque |
5000-7500 | (mm) Dimension |
2500×1200×1800 |
(rpm) Swing speed |
80-200 | (m) High leg stroke |
2.4 |
Containing BW160 mud pump |
Wanhai Machinery Co., Ltd., nestled in the heart of Linyi, Shandong, stands as a beacon of excellence in the manufacturing of premium drilling machinery and equipment. Our extensive catalogue includes innovative solutions for oil and gas, water well, and core drilling, tailored to a wide range of applications. Committed to excellence, we excel in crafting products and services that address the unique demands of each customer. Our dedicated after-sales team guarantees prompt resolution of any issues, ensuring optimal satisfaction and trust.
We are enthusiastic about forging lasting, trustworthy, and mutually rewarding partnerships with each of our valued customers. If our products pique your interest, we invite you to contact us. Our expert team is on hand to provide you with all the information and support needed to make an enlightened choice.
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2.How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
3.How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 25-30 days.
4. What's your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.