Product Description
The pipe pulling machine is a supporting auxiliary equipment for drilling machines in various rock and soil drilling and excavation projects. It is suitable for construction projects such as cast-in-place piles, rotary jet drilling, anchor cable holes, etc. that use the pipe following drilling process. It is used to lift and pull out the borehole wall casing and drill pipe.
The pipe pulling machine is a supporting auxiliary equipment for drilling machines in various rock and soil drilling and excavation projects. It is suitable for construction projects such as cast-in-place piles, rotary jet drilling, anchor cable holes, etc. that use the pipe following drilling process. It is used to lift and pull out the borehole wall casing and drill pipe. It can also be used for pulling out casing and drill pipes in various types of drilling tool accident handling. The pipe pulling machine has the advantages of simple and compact structure, safety and reliability, flexible response, simple and convenient operation and maintenance.
1. The pipe pulling machine is composed of four main parts: hydraulic station, oil cylinder, base, and clamp seat, which are connected with high-pressure hydraulic hoses
2. The hydraulic station is composed of an overflow valve, a high-pressure directional valve, and an oil circuit block.
3. The card holder is the clamping device of the pipe pulling machine, consisting of an internal card and an external card. The internal card can be made in different specifications according to customer needs to clamp different sleeves.
Parameters and models |
WH-400T |
Cylinder stroke (mm) |
500 |
Motor power (KW) |
5.5-13 |
weight(KG) |
180 |
Packaging & Shipping
Company Profile
FAQ
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2.How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
3.How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 25-30 days.
4. What's your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.